EV 311: WaterHydrology, Aquatic Chemistry & Ecology
|
| |
Introduction | Assignments | Grading |
Day/Time |
Topic |
Reading | |
Week 1: Arkansas Watershed & Water Resources | |||
Mon. |
AM |
CS Water Delivery Video Stream Hydrographs (Excel exercise; Data SS; Barnes PC Lab) Hydrologic Cycle Model (STELLA Model; Barnes PC Lab) Flood Frequency (Excel Calculations; Barnes PC Lab) |
Leopold |
PM |
Activity 1: Fountain Creek GIS Introduction (Palmer 20) |
||
Tues. |
AM |
||
PM |
Arkansas River
Field Trip |
||
Wed. |
AM |
Arkansas River
Field Trip |
|
PM |
Arkansas River Field Trip Chalk Creek Stream Survey |
||
Thurs. |
AM |
Arkansas Headwaters Recreation Area (9 AM) |
|
PM |
Riparian Ecology |
||
Fri. |
AM |
|
|
PM |
Sample Prep: Anions by IC, Cations by IC, BOD, E. coli |
Chalk Creek Project Description Data moved to Project page |
Week 2: Urban Impact Assessment: Chemistry, Ecology and Lab Analysis | |||
Mon. |
AM |
Dissolved Oxygen & Headwater Streams Introduction to Longitudinal Analysis Project Introduction to Final Project |
Hydrology Project Due (9 AM) |
PM |
Lab Analysis: Alkalinity, TDS/TSS, E. coli, Macroinvertebrates, DO |
Lab Manual | |
Tues. |
AM |
Aquatic Respiration Biochemical Oxygen Demand & Redox Chemistry |
|
PM |
Lab Analysis: Alkalinity, TDS/TSS, Macroinvertebrates, DO |
Lab Manual | |
Wed. |
AM |
Acid Rain |
|
PM |
Lab Analysis: Alkalinity, BOD, Macroinvertebrates, TDS/TSS |
||
Thurs. |
AM |
Human Impacts on Stream Health I Weak Acid Equilibria |
|
PM |
GIS Data Analysis | ||
Fri. |
AM |
Acid-Base Distribution Functions Phosphorous Cycle |
|
PM |
Fountain Creek Bicycle Tour Carol Baker-CS Utilities (1:30 PM) Final Project Proposals (guidelines) |
||
Week 3: Urban Impact Assessment: Part II |
|||
Mon. |
AM |
Human Impacts on Stream Flows |
|
PM |
Final Project Proposal Presentations |
|
|
Tues. |
AM |
Final Project Sample Collection |
|
PM |
Final Project Sample Collection |
||
Wed. |
AM |
||
PM |
Final Project Lab Analysis |
||
Thurs. |
AM |
||
PM |
Final Projects Lab Analysis |
||
Fri. |
AM |
Eutrophication & Hypoxia |
|
PM |
Chemistry & Longitudinal Review Sunday: Longitudinal Project (Individual) |
||
Week 4: Final Projects | |||
Mon. |
AM |
Project II Due (9 AM) Final Project Data Analysis: Group Meetings |
Long. Group Project Due 9 AM |
PM |
Final Project: Data Analysis | ||
Tues. |
AM |
Final Projects: Individual Meetings | |
PM |
Final Projects: Reports |
||
Wed. |
AM |
Final Reports Due (9 AM) |
Last Updated March 13, 2009
Webmaster: Howard Drossman, hdrossman@ColoradoCollege.edu
©copyright 2009 Colorado College Environmental Science Program
Aerobic & Anaerobic Respiration
Papers:
Poff: Natural Flow
Rhone R. Restoration
Paper: WWT
Nature: Stream denitrification
Water Treatment and Wastewater Treatment
Long. HW (3) Problems: pH of snow samples, ion concentration; regression analysis. Use: Long Data Set 2