EV 311: Water
Tentative Syllabus

Block 8, 2004

Jessica Delmonte,
Howard Drossman &
Hillary Hamann


Home

Syllabus

Links

References

Labs

Day

Time

Topic

Reading

Week 1:
Fountain Creek Watershed/Geochemistry

 

Mon.

 

AM

 

Class Introduction
Frameworks for Watershed Study
Final Project Introduction
Hydrologic Cycle

Making a Difference
Paper 1 (Karr)
Leo 1
Giller 1

 

PM

GIS Introduction
Barnes PC Lab
Handout

 

Tues.

 

AM

Depart to PP Hiway (8 AM)
South Catamount Reservoir (Drought)
Longitudinal Sampling Project
Snow Sampling
Giller 2

 

PM

Longitudinal Sampling Project
pH, DO and BOD Sampling
Biological Sampling

 

Wed.

 

AM

Physical Properties of Water
Chemical Equilibrium Review
Acid Rain I
Eby 1
Water on the Web

 

PM

Lab Analysis: Alkalinity, Anions by IC, Total Dissolved Solids, Trace Metals
Chem Help Session: 4 PM
 Lab Manual

 

Thurs.

 

AM

Acid Rain II: Acid/Base Chemistry Eby 2
Paper 2 (Likens)
 PM

Lab Analysis: Alkalinity, Cations by IC, Total Dissolved Solids, Trace Metals 

Chem Help Session: 4 PM
Carbonate Equilibria: Excel Assignment

 Lab Manual

  Fri.  AM

 

Acid Rain III: Carbonate Chemistry
Chem Help Session: 4:15 PM


Eby 3
Leo 2

   PM
GIS II: Watershed & Data Mapping
Take-Home Exam I


Watershedds

Week 2: Arkansas Watershed & Water Resources
Hydrological & Biological Effects

 

Mon.

 

AM

Acid Rain IV: Alkalinity, Buffers and Soil

Homestake & CS Water Delivery Videos

Eby 4

 

PM

Lab Analysis: BOD
Chem Help Session: 4 PM
Lab Manual

 

Tues.

 

AM

Arkansas River Field Trip

Elephant Rock (Hydrology I)

Leo 3
Paper 3

 

PM

Arkansas River Field Trip

Princeton HS (Stream Ecology I)

Giller 3

 

Wed.

 

AM

Arkansas River Field Trip

Hydrology II

Leo 4

 

PM

Arkansas River Field Trip
Pueblo Reservoir Limnology
Dams
Southern Water Delivery (Bob Robler, CSU)
Giller 4

 

Thurs.

 

AM

Mesa (Potable) Treatment Plant Tour (8 AM)
Longitudinal Sampling Project

Acid Rain V: Effects on Soil Ions

Eby 5
Leo 5

 

PM

Longitudinal Data (spreadsheet)

Las Vegas (Wastewater) Plant Tour (2 PM)

Water Treatment and Wastewater Treatment

 

Fri.

 

AM

Stream Ecology II
Giller 5

 

PM

Lonmgitudinal Project Office Hours (1 - 3:30 PM)
Take-Home Exam II
Exam II Data

Week 3: Assessing Human Impact on Streams & Drinking Water

 

Mon.

 

AM

Exam II Due
Longitudinal Reports Due
Stream Ecology III
Invertebrate Links
Giller 6
Eutrophication
Clean Water Act

 

PM

Water Delivery Wrap-Up
Final Project Rubrics

 

Tues.

 

AM

Stream Ecology IV
Class Visit: Ed & Betsy Marston (9-10 AM)

 

PM

Project Sampling Lab Manual

 

Wed.

 

AM

Soil, Groundwater & Snow Leo 6

 

PM

Project Sampling
&
Lab Analysis: Alkalinity, Anions by IC, Total Dissolved Solids, Trace Metals, Benthics, BOD, TSS, coliform
Lab Manual

 

Thurs.

 

AM

Groundwater Chemistry I Eby 6
Redox Equilibria

 

PM

Lab Analysis: Alkalinity, Anions by IC, Total Dissolved Solids, Trace Metals, Benthics, BOD, TSS, coliform

Chemistry Review 3:30 PM

Lab Manual

 

Fri.

 

AM

Groundwater Chemistry II
Review
Eby 7

 

PM

Lab Analysis: Alkalinity, Cations by IC, Total Dissolved Solids, Trace Metals, Benthics, BOD, TSS, coliform

Chemistry Review 3:30 PM

Take-Home Exam III

Lab Manual

Week 4: Final Projects

 

Mon.

 

AM

Exam III Due
Final Project Data Analysis
: Meetings

 

PM

Final Project Data Analysis

 

Tues.

 

AM

Final Project Data Analysis: Practice Presentations

 

PM

Final ProjectData Analysis

Class Evaluation

 

Wed.

 

AM

Final Reports Due
Presentation of Final Project Data


Last Updated April 13, 2004
Webmaster: Howard Drossman, hdrossman@ColoradoCollege.edu
©copyright 2004 Colorado College Environmental Science Program